New production facility

Thatchers Cider, Sandford

Unprecedented demand for their cider has lead Thatchers to invest in a new 30,000 ft2 production facility that will provide much needed space for kegging, bottling and canning of their premium lines. Requiring the design of a curved portal frame with feature glazed gabled elevation, TWP were also responsible for the design of a fully SUDS compliant surface water drainage scheme for this and future development of the site featuring an attenuation pond. Completed in spring 2014, the increased production capacity has allowed Thatchers to continue their growth that shows no signs of abating.